IKN Partial Pendulum Cooler for Lehigh Union Bridge, US

With a growing economy and rising demand for concrete and clinker in the United states, Lehigh (Heidelberg Group) awarded IKN for an upgrade of their existing clinker cooler at Union Bridge, Maryland.

Union Bridge is with 7200 tpd Lehigh’s largest operation in the US. The cooler in operation on-site exists of two movable grate sections and an intermediate roll crusher. Within this project, IKN will replace the first grate section up to the roll crusher and convert the hydraulic drive of the roll crusher to electro-mechanical drive.

IKN executes this project on turnkey basis with shutdown at the beginning of 2016 and less than 29 days flame-to-flame.